((free)) Download Liccon - Work Planner

For many modern construction sites, a formal lift plan is a legal or contractual requirement. The software generates detailed reports, including: specific to your configuration.

Best for users primarily concerned with load chart verification and basic 2D planning.

(essential for outrigger pad placement). Visual 2D and 3D diagrams of the lift. How to Download the LICCON Work Planner download liccon work planner

To ensure you have a secure and licensed version, always download directly from the Liebherr MyLiebherr portal. You will need to create a free account to access the software downloads. Step 2: Choose Your Version

By using the software, planners can determine if a specific crane can handle a load at a certain radius, identify the required counterweight, and visualize potential obstacles before the crane even arrives at the job site. Why You Should Download the LICCON Work Planner 1. Enhanced Safety and Risk Mitigation For many modern construction sites, a formal lift

The modern successor that integrates 3D environments, BIM data, and highly detailed rigging simulations.

Renting the wrong size crane is a costly mistake. The Work Planner allows you to select the most efficient crane for the job, ensuring you don’t overspend on a high-capacity machine when a smaller one would suffice, or worse, get stuck with a crane that can’t complete the lift. 3. Professional Documentation (essential for outrigger pad placement)

The LICCON (Liebherr Computed Control) Work Planner is a sophisticated software solution designed to simulate and plan crane operations on a PC. It mirrors the exact logic used by the on-board crane computers found in Liebherr’s mobile and crawler cranes.

Streamline Your Lifting Operations: A Complete Guide to the LICCON Work Planner

The primary reason to use the planner is safety. By simulating a lift digitally, you can identify "no-go" zones and ensure the crane remains within its rated capacity throughout the entire swing and radius of the operation. 2. Time and Cost Efficiency