Dp Dual Trac 20 Assembly Instructions Full Updated -
Before you begin, clear a 6' x 8' space for the machine and grab the following tools: Two adjustable wrenches (or a socket set) A Phillips head screwdriver A rubber mallet (optional, for seating end caps)
Insert the center selector rod through the plates and attach the cable end to the top of the rod.
Start at the lat bar attachment point. Thread the cable over the top pulleys, down through the "floating" pulley block, and back up to the anchor point on the frame. dp dual trac 20 assembly instructions full
Lift the top horizontal frame piece onto the vertical upright. Secure it with the heavy-duty bolts and washers.
Home gyms vibrate during use. Re-tighten all hardware after the first week of training. Before you begin, clear a 6' x 8'
Ensure the cables sit deep in the grooves of the nylon pulleys. If a cable rubs against metal, it will snap prematurely. Step 5: Weight Stack and Final Tensioning
Attach the fixed pulley brackets to the top frame and the base. Note the orientation: the "open" side of the bracket should face where the cable will enter. Step 4: Cable Routing (The Critical Phase) Lift the top horizontal frame piece onto the
Bolt the main vertical upright onto the base frame. Do not tighten these bolts fully yet; leaving them slightly loose helps with alignment in later steps. Step 2: The Seat and Backrest Carriage
Insert the weight guide rods into the base. Slide your weight plates on one by one.
Start at the leg developer/low row station. Thread it through the base pulleys, up through the underside of the floating pulley block, and anchor it to the rear stabilizer.