Wind, ice, and temperature loadings (NESC, IEC, or ASCE standards).
Before diving into the software, ensure you understand the hierarchy of the PLS ecosystem. PLS-CADD acts as the "central hub," integrating terrain data, structural models (from PLS-POLE or TOWER), and conductor physics. 1. Project Setup and Criteria
Assigning "Feature Codes" to survey points tells the software what it's looking at (e.g., Code 10 is "Ground," Code 50 is "Existing Conductor"). This allows the software to automatically calculate clearances. ⚡ Sag-Tension and Conductor Modeling Once the terrain is set, you must "string" the wires. pls-cadd tutorial pdf
Full 3D structural analysis by linking to a PLS-POLE or TOWER file (required for final engineering). 📝 Analysis and Reporting
Checks if the wire ever gets too close to the ground or obstacles under all weather cases. Wind, ice, and temperature loadings (NESC, IEC, or
The most common modern method for "as-built" models. XYZ Points: Basic survey coordinates for new construction. PFL Files: Traditional profile views. Key Step: Feature Coding
Minimum distances to ground, roads, and other lines. 🗺️ Terrain Modeling: The Foundation ⚡ Sag-Tension and Conductor Modeling Once the terrain
Automatically generates a "Bill of Materials" (BOM) for construction. 📂 Downloadable Resources & Next Steps