Direkt zum Inhalt springen

Visual Studio 2012 Update 5 Preparation.exe __link__ Review

Ensuring that the current Visual Studio installation isn't in a "pending restart" or "corrupt" state that could block the Update 5 installer. Core Features of Update 5

Before running the preparation tool or the main update, ensure your machine meets these Visual Studio 2012 System Requirements: 1.6 GHz or faster. RAM: 1 GB (1.5 GB if running in a virtual machine). Hard Disk: At least 1 GB of available space. visual studio 2012 update 5 preparation.exe

Preparing the environment for the "Team Project Rename" feature, which allows local workspaces to update automatically after a project is renamed in TFS. Ensuring that the current Visual Studio installation isn't

This is the headline feature, enabling local workspaces to recognize and adjust to renamed projects in TFS 2015 without manual re-mapping. visual studio 2012 update 5 preparation.exe